Customer cases

References

Infrastructure

Lemströmskanal bro

Construction of electrical drawings

Building of cabinets + network stalls

Programming and comissioning of control system, Siemens TIA

Integration of network communication between control stations with safety over fiber

SCADA & HMI integration

A major challenge was the synchronous control of the two electric motors that swing the bridge against a fixed gear ring. Advanced control ensures that the motors always share the load and work in harmony.

The completed system allows the bridge to be operated sequentially, stopped or changed direction at any time, and controlled from different control positions – with high operational reliability and flexibility.

Collaboration

Glue assembly with robot

Construction of electrical drawings

Building of cabinet

Robotics & servo motion

Safety torque off

HMI integration